|


| |
|
RECENT AND CURRENT COMMERCIAL PROJECTS |
PROJECT NAME/OWNER
SCOPE OF WORK
| Village of Doylestown: South Well Field and Raw
Water Line Doylestown, Ohio
|
Install 12" water supply well, Grundfos submersible well
pump, valve vault, access drive and all electrical and controls.
Status = Completed |
| City of Wooster: Production Well S-3
Wooster, Ohio |
Install vertical lineshaft turbine well pump with variable
frequency drive. All associated piping, valves, and electrical
work inside new well pump building. Status = Completed |
| Weaver Custom Homes: Heritage Green
Condominiums Kidron, Ohio |
Installation of (2) 6" diameter water wells to supply a
40,000 gallon underground clearwell. High service pumps,
pressure tanks, piping, valves and electrical controls. OEPA-required
testing completed. Iron removal system and chemical feed
pumps. Status = Completed 11/05 |
| Evergreen RV Park
Mt. Eaton, Ohio |
Installation of cistern and filtration
equipment. |
|