| Rehabilitation and Automation of Ohio
Groundwater Well Observation Network Phase II. (Ohio Dept. of
Natural Resources, Division of Engineering.)
|
Drill new wells and clean-out wells in various counties across the state of Ohio.
Provide new monitoring instrumentation for many of the wells.
(Status: Complete) |
| Marine Geotechnical Drilling Investigation (Ohio
State University, Stone Laboratory @ Put-In-Bay Ohio.)
Put-in-Bay Photos |
Geotechnical subsurface investigation to determine soil and
bedrock conditions for the installation of underwater utilities.
Requirements included transport of drill rig via ferry to two
different islands and marine borings required drilling from the deck
of a barge. (Status: Completed September 2005) |
| Statewide Water Well Abandonment Phase IV.
(Ohio Dept. of Natural Resources, Division of Engineering.) |
Perform sealing of over 40 wells in 8+ counties across the
state of Ohio. (Status: Completed April 2005) |
| Kenova, West Virginia (Marathon Petroleum
Terminal) |
Installation of piezometers and monitor wells using the
Geoprobe and Hollow Stem Auger Rigs. (Status: Completed
2007) |
| Moraine Assembly Plant (General Motors
Corporation) |
Sonic and large diameter Cable Tool Drilling to install
monitor wells, in order to perform groundwater profiling.
(Status: Completed 2007 |
| Brownfield Restoration Group |
Monitor Well installations at Clean Ohio Sites all over the
state of Ohio. (Status: Ongoing) |
| AK Steel (Middletown Ohio) |
Sonic and Geoprobe drilling to install test borings and
monitor wells. (Status: Completed 2007) |
| John Harhai Landfill (Mount Pleasant, PA)
(Pennsylvania Dept. of Environmental Protection) |
Hollow Stem Auger & Air Rotary Installation of bedrock
aquifer monitoring wells and methane monitor points. (Status:
Completed 2007) |
| Kyger Creek Landfill / American Electric Power
(Cheshire, OH) |
Air Rotary Installation of over 30 monitor wells and
performing Packer Testing. (Status: Completed 2007) |
| Plumbrook Ordnance Works / NASA (Sandusky, OH) |
Hollow Stem Auger & Geoprobe installation of piezometers and
monitor well installations. (Status: Completed 2007) |
| Jackson & Sons Drilling (Warsaw, KY) |
Assisted on a Geothermal Loop project, drilling over 4300 ft.
of 4" Sonic boreholes and installation of the geothermal loops.
(Status: Completed 2007) |
| Marathon Petroleum Company (Canton, Ohio) |
Installation of 16" Diameter Cable Tool, Screened production
well and abandonment of the existing well. Including a Sonic
test hole and sieve analysis. (Status: Completed 2007) |
| Jackson & Sons Drilling (Indian Lake,
Russells Point, OH) |
Assisted on a Geothermal Loop project, drilling over
50,000 ft. of 5" Sonic and Air Rotary boreholes and installation of the geothermal loops.
(Status: Completed October 2008) |
| Countywide RDF Landfill (East Sparta, OH) |
Installation of (2) 12" Relief Wells, using Air Rotary
methods. Soil Borings, gas probe and monitor well
installations, using Hollow Stem Auger and Sonic Drilling methods.
Thermocouple probe installations using Sonic Drilling methods.
(Status: Completed 2008) *Project still ongoing* |